-Durable, Water resistant, Acid and alkali-resistant, Freeze-thaw Resistance
-Formaldehyde removal, Moisture absorption and breathable
Brand Name:
Rungranda
Model:
Modified clay Bush Hammered Stone Coverings Tile
Size
595*280mm or customized
Thickness:
10mm-15mm
Color:
Red, black, grey, white, yellow, brown etc.,colors from natural soil.
Usage:
Indoor/outdoor floor, wall, countertop, vanity top, stair and so on
Component:
Modified Clay Material
Advantages:
It is thin and light, flexible and curvable, breathable, odorless & moisture resistant; Class A fireproof, Self-cleaning & Stain-Resistant, Anti-slip,Temperature & Moisture Control; Freeze-thaw Resistant,Durable,Water, Acid & Alkaline Resistant, Recyclable,Superb Expression.
Shipping Port:
Any port of China
Productivity:
2,400,000㎡/ month
Payments:
T/T, L/C, Western Union, etc.
Packing:
Luxurious Standard Exporting Package
Delivery Time:
Within 15-25 days,depends on customers' order quantity
Place of Origin:
Guangxi, China
Warranty :
10 Years warranty
Energy-saving:
Environment-friendly, Reduce 90% energy-wasting
Safe:
Light weight, thin, suitable for high-rises
Certificates:
CE, US Green Guard, Singapore Green Lable, ISO14001, ISO9001, etc.
Product Feature
1. Bendable: It can be used in curved, cylindrical, shaped, and other architectural shapes.
2. Fireproof: A class level fireproof: America ASTM-E84 Standard of the material
3. Breathable: Moisture-regulation building material, unfired clay can absorb and desorbs, indoor humidity faster than any other building design.
4. Light and Thin: Easier to install, cost and time efficient.
5. Durable: Through 2000 hours of anti-aging test, equivalent to more than 35 years of outdoor life, no chalking, no cracking, no skin, color change is less than 1.
6. Traditional exterior tiles in the hot and cold changes in the long-term repeated action, tile bonding layer cracking, bulging, peeling and other phenomena, and econic clay material with light, thin, flexible, breathable characteristics, not easy to produce bulging, peeling and other situations.
Introduction Of Installation Steps
1.After do basic level processing,dropped bomb line positioning.