CCP Installation

Process:

1.预处理基层墙面(Surface Preparation of the Base Wall)

在安装碳晶板之前,需要将基层墙面进行预处理,如清洗、批灰、打磨等,确保基层墙面平整清洁。

Before installing the carbon crystal panels, the base wall surface needs to be pre-treated. This includes cleaning, applying putty, and sanding to ensure the surface is smooth and clean.

 

2.粘贴拼装碳晶板(Adhesion and Assembly of Carbon Crystal Panels)

①粘贴碳晶板的时候,需要使用适当的胶水,并将胶水均匀地涂抹在背面。

 

②安装碳晶板时,需要采用重力固定法,即从低部开始往上贴,再使用平头铲将碳晶板压实。

 

①When adhering the carbon crystal panels, ensure you use the appropriate adhesive and apply it evenly on the back of the panels.

 

②During installation, use the gravity fixation method, starting from the bottom and working upwards. Press the panels firmly using a flat-head trowel.

 

3.处理接口(Handling Joints)

在粘贴碳晶板时,如果出现拼接的情况,需要选择合适的拼接方式。 通常情况下,可以使用胶水拼缝或者装饰条拼缝。
When adhering carbon crystal panels, if joints are needed, choose an appropriate method for joining. Typically, you can use adhesive for seam bonding or apply decorative strips to cover the joints.

 

4.安装流程总结(Installation Process Summary

Sunday,Monday,Tuesday,Wednesday,Thursday,Friday,Saturday
January,February,March,April,May,June,July,August,September,October,November,December
Not enough items available. Only [max] left.
Add to WishlistBrowse WishlistRemove Wishlist
Shopping cart

Your cart is empty.

Return To Shop

Add Order Note Edit Order Note
Estimate Shipping
Add A Coupon

Estimate Shipping

Add A Coupon

Coupon code will work on checkout page